delivery
Roadmap
Tidak dikerjakan: pool, Neon, docs site, billing, marketing.
On this page
- Status: Frozen (urutan), tanggal bersifat target
- Terkait:
MVP-2-WEEKS.md,08-delivery/ENGINEERING.md
1. Prinsip urutan
- Fondasi cell dulu, fitur kemudian.
- P0 manusia & bukti & yurisdiksi sebelum fitur AI lanjutan. Tanpa itu
needs_reviewmati dan enterprise berhenti di procurement. - Advisory end-to-end sebelum actuating.
- Engine deterministik sebelum AI di pack domain.
- Satu vertical pack selesai sebelum pack kedua.
2. Fase
Fase 0 — Foundation (minggu 1–2)
| Item | Exit criteria |
|---|---|
apps/core Hono + ProjectCell + Drizzle + migrasi | Cell hidup, migrasi jalan di blockConcurrencyWhile |
| Adapter pi-durable DO SQLite | Conformance suite pi-durable hijau |
POST /decisions, GET /decisions/{id}, GET /whoami | Tiga endpoint hidup di preview |
@cloudflare/vitest-pool-workers | Satu tes hibernasi/resume hijau |
| Audit outbox + hash chain (tulis lokal) | Setiap mutasi menulis outbox |
| CI: lint spec → tsc → vitest → dry-run | PR tidak bisa merge jika gagal |
Tidak dikerjakan: pool, Neon, docs site, billing, marketing.
Fase 1 — P0: manusia, bukti, yurisdiksi (minggu 3–8)
| Item | Kenapa P0 | Exit criteria |
|---|---|---|
| RBAC + actor context | Tanpa aktor, approval tidak berarti | Matriks peran ditegakkan; test 403 |
Review console /review | needs_review butuh permukaan | Antrean + keyboard flow + approve/reject |
| Approvals + four-eyes | Syarat enterprise | POST/GET /approvals, decide, test four-eyes |
| Audit ledger WORM | "Bisa diubah" = "tidak bisa jadi bukti" | R2 Object Lock + GET /audit/{id}/proof verified |
| Residency + egress allowlist | Memblokir procurement | X-Data-Residency, 403 residency-violation, test |
| Auth Better Auth + API key | Fondasi semua | Login, org, member, kunci mesin |
| Console shell | Konteks project/mode/health | Topbar, sidebar, context bar, command palette |
Gate: demo enterprise: satu project, dua role, satu approval, satu audit proof, satu residency violation.
Fase 2 — Launch: onboarding + decisions (minggu 9–14)
| Item | Exit criteria |
|---|---|
| Onboarding wizard (sources→mapping→contract→validate→backfill) | Time-to-first-decision < 4 jam di fixture |
| Dataset upload + query + schema | Presigned R2, quality gates |
| Sync fail-closed + quarantine + drift | Auto freeze saat drift |
| Decisions list/detail + SSE + feedback | Trace replayable |
| Review queue + approvals UI | End-to-end reference fixture (generic atau pack) |
| Usage + budget | 402 vs 429 terpisah |
| Marketing launch pages (7) | /, decisions, vertical packs, trust×3, pricing, sandbox, quickstart |
| Docs minimal | Quickstart + API reference + error catalog |
Launch definition: lihat PRD §11.
Fase 3 — P1: skala & vertical packs (bulan 4–6)
| Item | Kenapa P1 | Exit criteria |
|---|---|---|
| Jobs + batch | Backfill/eval tanpa ini tidak jalan | 202, resume, checkpoint |
| Compute pool | Parse/embed/render | Job chunked, tidak menulis cell |
| Analytics read path | Cell stall di query agregat besar | Snapshot → Neon; dashboard agregat |
| Assumptions + projections + scenarios | Membuka pack planning | Engine reproduksi laporan lalu |
| Connectors + actions + advisory | Nilai tambah integrasi | OpenAPI discover → action → advisory |
| Data health + syncs UI | Operasional | Skor, tren, quarantine |
| Feeds + subscriptions | Asumsi bersitasi | Signal → driver |
| Provider registry BYOK | Kebebasan provider | Capability routing, sealed secret, fallback eksplisit |
Fase 4 — P2: parit (bulan 7–9)
| Item | Exit criteria |
|---|---|
| Evals (agreement, F1, deviation, fairness) | Eval otomatis per rilis |
| Corrections → dataset eval | Koreksi manusia terukur |
| Documents render (template pack) | PDF/Excel deterministik |
| Actuating + approval | Hanya write_low/financial four-eyes |
| Platform sebagai MCP server | Decisions/actions dari IDE |
| Enterprise self-host (celld) | Satu pilot |
| Billing Polar + outbox | Usage akurat, tanpa double charge |
3. Milestone & metrik gate
| Milestone | Metrik gate |
|---|---|
| M1 Foundation | Tes hibernasi hijau; 3 endpoint; CI < 10 menit |
| M2 Trust | Audit proof verified; four-eyes test; residency test |
| M3 Launch | Time-to-first-decision < 4 jam; 7 layar; 7 halaman |
| M4 Vertical pack | Engine mereproduksi laporan lalu (selisih ≈ 0); 0 constraint violation |
| M5 Parit | Agreement > 85%; eval otomatis; 1 pilot enterprise |
4. Tim & paralelisasi
| Track | Fokus | Dependensi |
|---|---|---|
| A — Cell & domain | DO, SQLite, harness, decisions | — |
| B — Trust | Auth, RBAC, audit, residency | A (outbox) |
| C — Data | Onboarding, dataset, sync, pool | A |
| D — Console | Shell, review, onboarding UI | A, B |
| E — Marketing/Docs | Trust pages, quickstart, docs | B |
| F — Vertical packs | Engine, assumptions, projections | A, C |
Urutan paralel yang aman:
Minggu 1–2: A + B(outbox) + D(shell mock)
Minggu 3–4: A + B(RBAC/audit) + C(dataset) + D(review)
Minggu 5–6: A + B(residency) + C(onboarding) + D(onboarding UI) + E
Minggu 7–8: integrasi reference fixture + hardening
5. Definition of done per fitur
- OpenAPI path/schema ada dan lolos
redocly lint. - Tipe digenerate;
tsc --noEmithijau. - Unit test + minimal satu test Workers runtime.
- Test idempotensi (jika mutasi).
- Audit entry (jika mengubah state).
- RBAC (jika endpoint baru).
- Error code terdaftar di
ERROR-CATALOG.md. - Dokumentasi diperbarui.
- Observability: log + trace + metrik.
- Tidak ada
TODOtanpa issue.
6. Yang tidak dijadwalkan (sengaja)
- Chat playground.
- BI builder.
- Marketplace.
- Mobile native.
- Fine-tuning.
- Multi-tenant scheduler di celld.
- Blog/content marketing berat.
Jika ada permintaan, jawab dengan ADR — bukan langsung dikerjakan.