delivery
MVP — 2 Minggu Pertama
Jangan menginisialisasi harness di constructor. Ukur wake latency.
On this page
- Status: Executable
- Tujuan: Fondasi yang bisa diuji di runtime asli, bukan demo.
- Tidak termasuk: pool, Neon, docs site, billing, marketing.
1. Struktur kerja
10 hari kerja, 6 track kecil. Setiap hari berakhir dengan main hijau.
| Hari | Track A — Cell | Track B — Trust | Track D — Console |
|---|---|---|---|
| 1 | Workspace, apps/core, Hono, wrangler | Better Auth skeleton | Nuxt shell init |
| 2 | ProjectCell + migrasi Drizzle | API key (pd_test_) + auth middleware | Topbar + sidebar mock |
| 3 | Harness.open + adapter DO SQLite | Residency check + header | Context bar + command palette |
| 4 | Registry tools awal | RBAC skeleton + /whoami | /whoami store |
| 5 | POST /decisions (sinkron) | Audit outbox + hash chain | Decision detail mock |
| 6 | GET /decisions/{id} + SSE | Audit worker → R2 Object Lock | Decisions list |
| 7 | Idempotency + budget counter | GET /audit/{id}/proof | Review queue skeleton |
| 8 | Tes hibernasi/resume | RBAC tests + four-eyes stub | Approve/reject UI |
| 9 | Error handling + problem+json | CI lengkap | Wiring API |
| 10 | Hardening + demo | Demo audit proof | Demo shell |
2. Deliverable konkret
2.1 Repo
agnestra/
├── package.json (workspace)
├── bun.lock
├── tsconfig.base.json
├── openapi.yaml (sudah ada)
├── apps/core/
├── apps/console/
├── packages/api-types/ (generated)
├── packages/contracts/
└── packages/core/
2.2 Endpoint hidup
| Endpoint | Perilaku |
|---|---|
POST /v1/decisions | Sinkron; idempotent; menyimpan trace; audit outbox |
GET /v1/decisions/{id} | Mengembalikan decision + evidence + biaya |
GET /v1/whoami | Actor, roles, residency, limits |
GET /v1/jobs/{id} | Minimal untuk async (boleh stub) |
GET /v1/audit/{id}/proof | Hash chain + Object Lock (minimal satu entry) |
2.3 Test hijau
-
redocly lint openapi.yaml -
openapi-typescript→ diff bersih -
tsc --noEmit - ESLint (larangan
node:*dipackages/core) - Vitest unit (policy, validator)
-
vitest-pool-workers: cell create, migrate, decision, hibernasi/resume - Idempotency: same key + body sama → replay; body beda → 422
- Audit chain: entry valid; tamper terdeteksi
- RBAC: mesin tidak bisa approve (403)
- Residency: region salah → 403
2.4 Console
- Shell: topbar, sidebar, context bar, command palette (mock)
- Project switcher (mock)
-
/decisionslist + detail (API nyata) -
/review/queueskeleton (API nyata bila tersedia) -
/whoamimenyembunyikan menu yang tidak berhak
3. Urutan teknis yang disarankan
Hari 1–2 — Fondasi
bun init
bun add hono@4.13.23 drizzle-orm@0.45.4
bun add -d wrangler@4.168.0 @cloudflare/workers-types@5.20261127.1
bun add -d vitest@5.1.2 @cloudflare/vitest-pool-workers@0.23.0
bun add -d openapi-typescript@7.13.0 @redocly/cli@2.84.0
wrangler.jsonc: DO bindingPROJECT_CELL, R2 binding, queue (stub).ProjectCelldenganctx.storage.sql.- Migrasi awal:
agents,decisions,idempotency_keys,audit_outbox,usage_counters.
Hari 3–4 — Harness
- Adapter
openNodeSqliteStorage(dev) +doSqliteStorage(produksi). - Jalankan conformance suite pi-durable.
Harness.open(storage, …)diblockConcurrencyWhile.- Registry tool:
query_dataset(stub),propose_decision.
Jangan menginisialisasi harness di constructor. Ukur wake latency.
Hari 5–6 — Decision path
- Validasi input Ajv dari schema agent.
- Policy versi
2026-10-01(deterministik). - Panggil model via mock gateway (belum provider nyata).
- Validasi output + evidence + simpan trace + audit + usage dalam satu transaksi.
- SSE minimal (
phase,done).
Hari 7–8 — Trust
- Better Auth: login, org, project.
- API key
pd_test_(hash di control plane, prefix lookup). - RBAC middleware +
/whoami. - Residency middleware +
X-Data-Residency. - Audit worker: baca outbox → tulis R2 Object Lock →
delivered_at.
Hari 9–10 — Hardening
- Problem+json konsisten.
- Rate limit vs budget (402 vs 429).
- Test hibernasi: panggil DO, tunggu, panggil lagi, state benar.
- Demo: satu project, satu decision, satu audit proof, satu 403 RBAC.
4. Yang sengaja ditunda
| Item | Alasan | Kapan |
|---|---|---|
| Pool | Tidak diperlukan untuk 3 endpoint | Fase 3 |
| Neon | Analytics belum ada | Fase 3 |
| Billing | Belum ada pelanggan | Fase 4 |
| Marketing | Fokus fondasi | Fase 2 |
| Docs site | Bisa menyusul | Fase 2 |
| Actuating | Risiko tinggi | Fase 4 |
| Vector search | Belum ada dataset | Fase 3 |
5. Risiko 2 minggu
| Risiko | Mitigasi |
|---|---|
| Adapter pi-durable tidak cocok | Spike hari 3; jika gagal, pakai memory storage untuk demo dan tunda adapter |
| Migrasi Drizzle DO bermasalah | Fallback raw SQL untuk migrasi kritis |
| Auth terlalu lama | Gunakan Better Auth minimal; SSO ditunda |
| UI mengejar API | Mock dulu; wiring hari 9 |
| Scope creep | Daftar "tidak dikerjakan" di atas adalah kontrak |
6. Demo akhir
- Buka
/app, pilih project. curl POST /v1/decisionsdenganpd_test_.- Lihat decision di
/decisions/:id(evidence + biaya). - Buka
/review/queue, setujui satu kasus. - Buka
/audit, lihat proof hash chain. curldengan key tanpa scopeapprovals:writeke endpoint approve →403 insufficient_scope.curldengan header region salah →403 residency-violation.- Restart worker; decision & session tetap ada (hibernasi/resume).